Got some stuff done today, not a whole lot, but more then yesterday.
Dropped the tank to find out it is bent pretty badly on the drivers side, not like a dent, but folded and creased in an odd fashion, i'll be running it until I can get a new one. Replaced the fucked up fuel lines with the ones from the yard. Finished installing the trans, tightened all the bolts since I didnt have the proper ones yesterday. Installed the a/c system, replaced ALL the seals and vacced it. Holds vacuum just bitchen, I used the old drier however as this was just a test of the system. Once its ready to be fired i'll install the new drier and charge the system with actual r12.
Also did a mild wire tuck, wiring harness still runs along the firewall but the wires now tuck into the fenders. I only did this to increase space in the engine bay, not really anything else. Honestly not a big fan of wire tucks to be honest, but with the power cooler and vortech stuffed into the engine bay it will be nice to have some extra finger room.
Now for dah pics
Holding Vacuum like a boss
New seals
Monster 340lph pump