View Single Post
Old 12-31-2008, 01:33 PM   #2
VettezukiVettezuki is offline
I, Vettezuki
 
Vettezuki's Avatar
 
Join Date: Feb 2006
Posts: 14,754
Default Project Schedule

UPCOMING DATES
Work on Tuesday June 8 and Thursday June 10.

PHASE BREAKDOWN
PHASE 1
- Acquire Car -- DONE
- Strip Car 90% -- DONE
- Transport SBF and Trans to Vettezuki's house for later installation. -- DONE
- Acquire Heads -- DONE
- Repair Holley 174 -- Underway
- Cage car 6 point -- DONE
- Assemble engine -- Fully dissassembled
- Acquire Headers
- Acquire Carb -- DONE

PHASE 2
- Setup Axle
- Suspension -- Fully removed and disassembled
- Check and rebuild brake system as needed
- Begin Body Prep -- Underway
- Body fabrication -- Front and rear bumper, well underway
- Gauge layout and dash fabrication

Phase 3
- Mock up, installation check
- Body and Paint

Phase 4
- Install engine system and trans
- Install interior
- Install electrical
- Shake out bugs, loose ends
__________________
Motorgen on
To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.

Motorgen on
To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.

Motorgen Project Car
To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.
(active)
Motorgen Project Car
To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.
(back burner)

Last edited by Vettezuki : 06-09-2010 at 04:19 PM.
  Reply With Quote