This will be the Master thread, containing the project management and other top level stuff. Other threads will be created for dedicated subjects.
BASIC VEHICLE DESCRIPTION 1987 RX-7 Small Block Ford 302 Holley 174 Blower 12-15 psi with meth/propane 4 speed manual top loader Ford 8.8" or 9" solid axle rear Almost fully striped (minimal electrical retained) 6 Point Cage Custom Paint and Logos Custom Body work ================== Video of torching off wheel, it's a hoot! We expect the car to run mid 10s@130~ with a good driver. The car will be about 450WHP and 2,700 lbs. joedls has graciously provided the engine transmission and blower. We owe him big time. :hail: This thread is for active project participants. If you are not a participant but have any questions or comments, please use this thread. If you have any SBF, RX-7, other parts, money or time you'd like to contribute post in this thread and poof you're a participant. Please see the next three posts for project management overview. |
Project Schedule
UPCOMING DATES
Work on Tuesday June 8 and Thursday June 10. PHASE BREAKDOWN PHASE 1 - Acquire Car -- DONE - Strip Car 90% -- DONE - Transport SBF and Trans to Vettezuki's house for later installation. -- DONE - Acquire Heads -- DONE - Repair Holley 174 -- Underway - Cage car 6 point -- DONE - Assemble engine -- Fully dissassembled - Acquire Headers - Acquire Carb -- DONE PHASE 2 - Setup Axle - Suspension -- Fully removed and disassembled - Check and rebuild brake system as needed - Begin Body Prep -- Underway - Body fabrication -- Front and rear bumper, well underway - Gauge layout and dash fabrication Phase 3 - Mock up, installation check - Body and Paint Phase 4 - Install engine system and trans - Install interior - Install electrical - Shake out bugs, loose ends |
Parts Needed and Open Questions
PARTS - This is a VERY partial list, but are for sure required.
Engine Related - Starter - DONE - Alternator - DONE - Alt bracket - Joe thinks he has one - Main Pulley - Joe thinks he has one - Headers - MLS Head Gaskets (can you say boost baby!) - Distributor - Plugs - Wires - Radiator - Carburetor - DONE Trans Related - Scatter Shield - DONE - Shifter - DONE (in shipping) - Drive Shaft - We have one to work with Msc - Line Lock - Battery - Wheels and tires for the rear, tires on stock wheels in the front Suspension - Front Struts - Rear shocks |
Project Log
December 31, 2008: Decided on RX-7 with Forced Induction SBF. See this thread for history of discussion.
2009 January 3, 2009: Purchased 1987 Gen II RX-7, began stripping. January 4: Removed engine and trans, continued to strip harness and clean. Decided to make the car minimally streetable, with "show car" registration January 5: Received Engine and Trans from joedls. Continued to clean. January 6-7: Continued cleaning and stripping January 9: Purchased pair of Avenger 195cc Heads January 10: Received Electric fan from kdracer73 January 11: Continued cleaning and stripping. Transferred to 94cobra69ss396 for caging. Caging begun. January 23: Received Heads January 24: Ron continued Work on Cage January 28: Picked up Alt + Starter January 29: Removed stock heads, began cleaning block in prep for paint. Discovered valves in new heads won't work with current pistons. February 4: Ron Completed Cage February 8: Purchased Carburetor, checked cam, continued stripping down and cleaning engine. February 13: Picked up blower from Joe February 14: Joe dropped off oil pan. Picked up SBC Crossmember, TKO Trans Mount, DS, and MC from buddy. March 1: Joe acquired Scatter shield at swap meet. March 13: Ron completed fabricating installing modified trans cross member and fabricating motor mounts, including fitment checks March 14: Ron dropped off RX-Snake back my house March 21: Full day group effort on body prep March 22: joedls dropped off scatter shield and blower intake March 25: Death Cult Aaronmageddon began working on front bumper, I began removing sound deadening material, etc. March 28: Death Cult worked on Front Bumper, I continued removing harness, sound material, etc. March 29: DC continued with front bumper, I did msc, clean and prep, big2bird dropped off C5 radiator for trial March 30: DC continued with front bumper, April 3: Major patio and garage cleaning April 6: Received Renagate shifter April 10: Worked with DC on front bumper and misc stripping cleaning April 12: Major cleanup of work area April 13: Pull internals from engine with Ron. April 19: Began stripping the remnants of the sou nd insulation with a Scotch Brite pad April 24: DC worked on the bumper May - August Front and rear bumper fabrication related work, engine dissassembly and lots of tidbits September - June: Here and there on the front and rear bumpers, and getting the blower sorted. 2010 We're back yo! June 8, 10: Front and rear bumper, body work, etc. |
I'm excited. :D
|
Quote:
|
Quote:
|
Top 4 Posts
I'll use the top 4 posts as our ghetto project management. Keep an eye on them, they'll change continuously.
|
I am down to help out with time and maybe even a little money. Lets do this!! :nuts: :woot::creepy_thumbsup::thumbs_up:
|
See Phase breakdown in Project Schedule to see if it makes sense to you guys. Ok, I'm going to clean up my patio now for this project.:drink:
|