blackax
10-23-2011, 11:08 PM
Well I'm headed to Death Valley next month and I need to do a few things to get my truck up to spec.
Project number one is a roof rack. I'll need it large enough to hold sleeping supply's, lights, gas, water that kind of stuff.
I can just buy one but a good one would run me a few hundred bucks. So i'll just build it. :D
https://lh6.googleusercontent.com/-5JVtKHMKEqc/Tnfb7DN-LyI/AAAAAAAAEqo/sUZ0A5PSFek/s800/2011-09-19_17-15-50_518.jpg
https://lh3.googleusercontent.com/-_VOQ64eBVvU/Tou6ZnG5C5I/AAAAAAAAEqM/rGjsGPkWyKs/s800/IMG_20111004_190040.jpg
https://lh5.googleusercontent.com/-uUQgX-5CNdE/TovBgd9MaPI/AAAAAAAAEqM/ZeYn-d96okw/s800/IMG_20111004_193100.jpg
https://lh4.googleusercontent.com/-voQf35mO-Tk/TpUlIONCHhI/AAAAAAAAEqM/gpj2fVQ680E/s800/2011-10-06_20-48-22_565.jpg
https://lh4.googleusercontent.com/-RVyu5fck5cY/TpUlhMlW41I/AAAAAAAAEqM/7JGhjg1JMHg/s800/2011-10-06_20-48-11_410.jpg
https://lh5.googleusercontent.com/-btcuhq-OUPQ/TpUgEyJYK1I/AAAAAAAAEqM/F-X_gpWjh_I/s800/2011-10-10_07-40-38_759.jpg
https://lh6.googleusercontent.com/-U-Qms9DqSMk/Tp5cYj8xOGI/AAAAAAAAEqM/u25SSLsU3I4/s800/2011-10-18_22-12-30_640.jpg
https://lh6.googleusercontent.com/-uSMBwS3mWic/Tn_tyxbP7sI/AAAAAAAAEqo/G7Ll1D5fRW8/s800/2011-09-25_20-12-52_36.jpg
https://lh6.googleusercontent.com/-mbtOF1ZWh_c/TqS0eB11ptI/AAAAAAAAEyg/TcoL37lv-ZA/s800/2011-10-23_17-42-12_586.jpg
I have wires run in the rack for 12 lights, 5 in the front, 2 on each side, and 3 in the back.
I still need to finish up the wiring in the little back area but it's all mounted on :D
So far I have 80 bucks in metal, paint, plugs, wires and what not. and about 2 weeks of after work time spent in it.
Project number one is a roof rack. I'll need it large enough to hold sleeping supply's, lights, gas, water that kind of stuff.
I can just buy one but a good one would run me a few hundred bucks. So i'll just build it. :D
https://lh6.googleusercontent.com/-5JVtKHMKEqc/Tnfb7DN-LyI/AAAAAAAAEqo/sUZ0A5PSFek/s800/2011-09-19_17-15-50_518.jpg
https://lh3.googleusercontent.com/-_VOQ64eBVvU/Tou6ZnG5C5I/AAAAAAAAEqM/rGjsGPkWyKs/s800/IMG_20111004_190040.jpg
https://lh5.googleusercontent.com/-uUQgX-5CNdE/TovBgd9MaPI/AAAAAAAAEqM/ZeYn-d96okw/s800/IMG_20111004_193100.jpg
https://lh4.googleusercontent.com/-voQf35mO-Tk/TpUlIONCHhI/AAAAAAAAEqM/gpj2fVQ680E/s800/2011-10-06_20-48-22_565.jpg
https://lh4.googleusercontent.com/-RVyu5fck5cY/TpUlhMlW41I/AAAAAAAAEqM/7JGhjg1JMHg/s800/2011-10-06_20-48-11_410.jpg
https://lh5.googleusercontent.com/-btcuhq-OUPQ/TpUgEyJYK1I/AAAAAAAAEqM/F-X_gpWjh_I/s800/2011-10-10_07-40-38_759.jpg
https://lh6.googleusercontent.com/-U-Qms9DqSMk/Tp5cYj8xOGI/AAAAAAAAEqM/u25SSLsU3I4/s800/2011-10-18_22-12-30_640.jpg
https://lh6.googleusercontent.com/-uSMBwS3mWic/Tn_tyxbP7sI/AAAAAAAAEqo/G7Ll1D5fRW8/s800/2011-09-25_20-12-52_36.jpg
https://lh6.googleusercontent.com/-mbtOF1ZWh_c/TqS0eB11ptI/AAAAAAAAEyg/TcoL37lv-ZA/s800/2011-10-23_17-42-12_586.jpg
I have wires run in the rack for 12 lights, 5 in the front, 2 on each side, and 3 in the back.
I still need to finish up the wiring in the little back area but it's all mounted on :D
So far I have 80 bucks in metal, paint, plugs, wires and what not. and about 2 weeks of after work time spent in it.